Skip to content

Sales Management

Roofing Sales Commission Structures: 5 Plans, Worked Math

Tim Nussbeck··
Summarize with:
Opens your selected AI service.

Short answer: roofing companies pay sales commission on one of three bases: a percentage of the contract or collected revenue, a percentage of gross profit after job costs, or a share of profit after an overhead allowance (the 10/50/50 family). Published sources put revenue plans around 7 to 15 percent and profit plans around 20 to 50 percent, but the base, the tier rule and the earning event change the dollars more than the headline rate does.

What this page does: it runs one fictional $18,000 job through five plans from published roofing sources, shows marginal and retroactive tiers on the same month, and lists what a written plan must define. For how much reps end up earning, read the roofing sales pay guide; this page is about how the plan is built.

Every roofing commission plan answers four questions: what the percentage is applied to, whether the rate changes with volume or margin, when the commission is earned, and when it is paid. Two companies can both advertise "10 percent" and pay different amounts for the same roof because they answer those questions differently. The sections below use plans that roofing-industry publishers have put in writing, with dates, and keep the arithmetic visible so you can rerun it with your own numbers.

The Three Bases, and What Each One Rewards

BaseWhat the percentage is applied toWhat it rewardsWhat it risks
Revenue (contract value or collected)The signed contract, or the cash actually collectedVolume. Simple to explain and to audit from the contractDiscounting: a rep gives away margin and still earns the full rate on a smaller number
Gross profitContract minus defined direct job costs (materials, labor, permits, disposal)Pricing discipline and upsells that carry marginDisputes when job costing is late, estimated or changed after the sale
Profit after overhead (10/50/50 and variants)Contract minus an overhead allowance, minus job costs, then splitTreats the rep as a partner in the job's economicsLarge payouts on high-margin jobs; the overhead allowance has to be set honestly

The base decides who can check the number. A revenue plan can be verified from the signed contract. A gross-profit plan requires the rep to see the job-cost sheet and the company to close it the same way every time. The sales margin calculator shows how margin, markup and overhead interact before you pick a base.

What Published Roofing Plans Look Like

Three roofing-industry publishers describe their plans in enough detail to compare. Figures are quoted from the sources as of October 12, 2026; they describe those authors' plans and examples, not a survey of the industry.

Published roofing commission plans, with the rates each source states
Source and datePlanStated rate or example
Contractors Cloud, September 10, 2025Percentage of total revenue10% of a $20,000 contract pays $2,000
Percentage of gross profit$20,000 contract, $12,000 job costs, $8,000 gross profit; 25% pays $2,000
Tiered by margin20% of gross profit under a 35% margin, 25% from 35% to 45%, 30% above 45%
Splits, milestones, draws, feesSetter and closer split 30/70; commission paid 30% at signing, 40% at install, 30% at paid in full; a $500 canvasser fee per signed job
Hook Agency, December 22, 2021, edited November 7, 202510/50/50 split10% of the sale price to overhead, job costs out of the rest, profit split 50/50: on a $10,000 job with $7,000 costs the rep earns $1,000
Percentage of collectedAdam Bensman's version scales from 7% to 12% of collected revenue with the rep's responsibilities and volume; insurance jobs under 10/50/50 average 10% to 20% of the job
Percentage of margin after overheadDallas Werner's alternative: remove an overhead percentage, pay 40% of the remaining margin, and cap job profitability near 50% to 60%
Roof Sales Mastery, undatedPercentage of gross"Usually 8-15%"; 10% of a $15,000 roof pays $1,500
Percentage of profit after 10% overhead"Usually 25-50%, after 10% overhead"; new reps may start at a lower percentage

Notice what the ranges have in common: the profit-based percentages are two to four times the revenue-based ones because they apply to a much smaller number. A 25 percent plan is not more generous than a 10 percent plan until you run a job through both.

One Job Through Five Plans

The job below is fictional. Contract value $18,000. Direct job costs $11,700 (materials, labor, permit, disposal), so gross profit is $6,300, a 35 percent margin. The company's overhead allowance is 10 percent of the contract, $1,800. The customer took a $400 credit at the end for a cancelled gutter line, so collected revenue is $17,600.

Same job, five plans; rates are the published examples above
PlanArithmeticCommissionWhat the rep can audit
10% of contract value10% × $18,000$1,800The signed contract
10% of collected revenue10% × $17,600$1,760The payment record; the $400 credit cost the rep $40
25% of gross profit25% × ($18,000 − $11,700)$1,575The job-cost sheet; on a collected basis the profit is $5,900 and the commission $1,475
10/50/50($18,000 − $1,800 overhead − $11,700 costs) × 50%$2,250Overhead rate, job costs and the split
Tiered by margin (20/25/30)35.0% margin lands in the 35% to 45% band: 25% × $6,300$1,575The margin calculation and the band edges

Three things to see in that table. The 10/50/50 plan pays the most on this job because the overhead allowance comes out before the split and the margin is healthy; at a 25 percent margin the same plan pays $450 and the revenue plan still pays $1,800. The tiered plan pays exactly what the flat 25 percent plan pays until the margin crosses a band edge: at a 30 percent margin ($12,600 of costs) it drops to 20 percent of $5,400, or $1,080, and at a 50 percent margin ($9,000 of costs) it rises to 30 percent of $9,000, or $2,700. And the collected-revenue plan quietly moves credits, cancellations and collection problems onto the rep, which is a design choice the plan should say out loud.

Marginal or Retroactive Tiers: The Same Month, $5,000 Apart

Volume tiers like Bensman's 7-to-12-percent scale have to say whether the higher rate applies only to revenue above the threshold or to everything in the period once the threshold is crossed. Take a month with $150,000 of collected revenue and a tier that moves from 7 percent to 12 percent at $100,000.

Tier ruleArithmeticCommission
Marginal (the higher rate applies to the increment)7% × $100,000 + 12% × $50,000$13,000, an 8.7% blended rate
Retroactive (the higher rate applies to the whole month)12% × $150,000$18,000

A retroactive tier creates a cliff: the $100,001st dollar is worth $5,000 to the rep, which pushes jobs to be signed, dated or collected on whichever side of the month-end serves the rep. A marginal tier removes the cliff but is harder to explain in a hiring conversation. Either can work; a plan that does not say which it is will be read as retroactive by the rep and marginal by the owner, and that argument arrives with the first big month.

When Commission Is Earned, and When It Is Paid

The earning event and the payment schedule are separate terms. Contractors Cloud's milestone example splits a commission into 30 percent at contract signing, 40 percent at installation and 30 percent at paid in full. On the $1,800 revenue-plan commission above, that is $540, $720 and $540. The pattern matches a roofing company's own cash: a deposit at signing, the bulk of the invoice at completion, and the balance (or the insurance depreciation check) later.

TermCommon choicesWhat to write down
Earning eventSigned contract; installation complete; paid in full; a combination by milestoneWhich event, and what happens to an advance if a later event never occurs
Payment dateNext pay period after the earning event; a fixed day of the monthThe lag, and whether a job-cost true-up can change an amount already paid
DrawA fixed advance reconciled against earned commissionWhether it is recoverable; Contractors Cloud's example nets a $2,000 draw against $2,500 earned for a $500 payout
ChargebacksCancellations, credits, uncollected balances, warranty callbacksWhich events reverse commission, over what window, and on which base
Supplements and change ordersIncluded in the base, excluded, or paid at a different rateInsurance supplements and overhead-and-profit approvals can move a job's revenue by thousands after signing

Wage law constrains some of these choices for employees, and the answer differs for a 1099 contractor. Read W-2 vs 1099 roofing sales before writing deduction or chargeback terms, and have counsel review the plan; this page does not give legal advice.

Splits for Setters, Canvassers and Closers

When more than one person touches a sale, the plan needs a split rule before the first disputed job, not after. Contractors Cloud's examples are a 30/70 setter-to-closer split of a $2,000 commission ($600 and $1,400) and a flat $500 canvasser fee for each signed job. Hook Agency's version of the question is about responsibility: Bensman starts a new rep near 7 percent of collected when others handle fulfillment and moves toward 12 percent as the rep owns more of the job, and notes that a rep who handles most of the job may earn the full 10/50/50 split.

Whichever rule you pick, the split should name the event that qualifies a setter (a held appointment, not a booked one) and the document that proves it, or the CRM will contain two people claiming the same roof.

What the Written Plan Must Define

  • The base, line by line: contract value or collected; which costs count as direct; whether taxes, fees, discounts, financing costs, permits and disposal are in or out.
  • The margin or volume measure used for tiers, where the band edges are, and whether tiers are marginal or retroactive.
  • The earning event and the payment schedule, including the lag.
  • Supplements, change orders and overhead-and-profit: in the base or not, and at what rate.
  • Chargebacks: which events, what window, on what base, and the wage-law review that allows them.
  • Splits and the evidence that qualifies each role.
  • Visibility: what the rep can see, and when, to check the number.

Build the first draft in the roofing sales commission plan builder, then put two candidate plans side by side in the commission plan comparison tool with the same completed job.

Choosing a Structure by Sales Motion

Insurance restoration. The contract value is set largely by the adjuster's scope and the supplement process, so a revenue plan rewards the rep for volume and for documented supplements rather than for pricing. Hook Agency reports that insurance jobs under a 10/50/50 split average 10 to 20 percent of the job in commission, higher where the carrier pays overhead and profit or the roof is steep. If supplements are a large share of revenue, say how they enter the base; the supplement request generator shows what a documented supplement looks like.

Retail replacement. The rep sets the price, so margin-based plans (gross profit, 10/50/50 or a margin tier) align pay with the company's economics and discourage discounting. The cost is administrative: job costing has to close reliably and reps have to see it.

New reps. Both Roof Sales Mastery and Bensman describe starting a new rep at a lower rate and raising it with responsibility. If you do that, write the milestones that trigger each step so the rep is not negotiating every month. Pay structure also shows up in retention; the roofing sales turnover page covers how to tell early-hire churn from the loss of proven reps.

Frequently Asked Questions

What is a typical roofing sales commission?

There is no official average. Published roofing plans put revenue-based commission around 7 to 15 percent of the contract or collected revenue and profit-based commission around 20 to 50 percent of gross profit or profit after overhead, depending on the source and the rep's responsibilities. Run one job through the plan to compare offers; the percentages alone do not say which pays more.

Is 10 percent of revenue or 25 percent of gross profit better?

On the $18,000 job above, 10 percent of contract pays $1,800 and 25 percent of gross profit pays $1,575. The profit plan passes the revenue plan when the margin rises above 40 percent and falls further behind when it drops. The revenue plan is better for a rep who cannot control price; the profit plan is better for the company when reps set price and job costing is reliable.

What is a 10/50/50 roofing commission?

Ten percent of the sale price goes to company overhead, direct job costs come out of the remainder, and the profit left is split evenly between the company and the rep. Hook Agency's example pays $1,000 on a $10,000 job with $7,000 of costs. The same source cautions against giving reps 50 percent of profit without a written handbook of what the rep is responsible for.

When is roofing commission earned?

Whenever the plan says: at signing, at installation, at collection, or in milestones such as 30/40/30. For employees, wage law limits how an earned commission can be reduced later, so the earning event and any chargeback rule need legal review.

Should insurance supplements pay commission?

Many plans include approved supplements in the revenue base because the rep documented them; others pay a different rate or exclude them. The plan has to say which, and whether the base is the approved scope or the amount actually collected from the carrier.

Next Step

Draft the plan, run three real completed jobs through it, and show the reps the arithmetic before the first commission check. If the conversations that produce those jobs are the problem rather than the plan, GhostRep's roofing sales coaching workflow records appointments, coaches from what was said, and starts with prepaid hours instead of a demo call.

Method and Disclosure

The published plans and rates above were read from the linked pages on October 12, 2026 and are quoted as those authors state them. The $18,000 job and the $150,000 month are fictional planning examples, not GhostRep customer data or industry averages. GhostRep sells sales training and coaching software to roofing companies and does not sell compensation consulting.

Free tools for sales managers

Turn this into a manager workflow

Use free management and operations tools to turn coaching ideas into repeatable systems for your reps and managers.

Sales ManagementSales Hiring

About the Author

Tim Nussbeck

Founder & CEO of GhostRep

20+ years in roofing and home improvement sales—knocking doors, running teams, and building practical coaching systems. Built GhostRep to give every rep access to the coaching top teams get.

Manager next step

Turn this into a manager workflow your team can repeat

Use the management tools if you need a practical coaching or accountability system first. Book a walkthrough if you want GhostRep tied to rep performance and live coaching.

  • ✓Best fit if coaching is inconsistent across reps and managers.
  • ✓Useful for 1-on-1s, scorecards, and weekly operating rhythms.
  • ✓Demo shows how AI Sales Coach turns performance data into specific guidance.

Start Here

Browse management tools

Open scorecards, coaching docs, forecast templates, and manager workflows.

Browse management tools

Need it mapped to your team?

Talk through your current workflow, traffic mix, and where GhostRep fits before you change anything.

Book a 15-minute walkthrough

You Might Also Like

Public data on construction turnover, why no roofing-sales average exists, and a calculator for your own period, early-hire and productive-rep turnover.

Read article →

Turn a roofing sales conversation into reliable call notes. See a full example separating facts, customer statements, unknowns and owned actions.

Read article →

Use a seven-gate roofing CRM rollout plan for workflow mapping, configuration, pilot testing, role training, go-live, and the first 30/60/90 days.

Read article →